English flag drapeau français
Site Logo

IDRICOM CAPABILITIES

IDRICOM CAPABILITIES
In the absence of preliminary geological and engineering studies (but which IDRICOM would be able to quote for and carry out), we have hypothesized 3 intervention scenarios in terms of the potential number of wells that the Consortium can build using rotation drilling rigs, both mounted on trucks and on tracks, with pull-back as described in the tables below. This choice has been made in the belief that such drilling rigs are best suited to the area under study, in view of the condition of local roads. In any case, any project abroad envisages drilling in any type of geological formation (alluvial, metamorphic, sedimentary etc.) which might be present in three different scenarios as specified below.
  • Some datas: well depth, expected yield, minimum final casing diameter, bore diameter, drilling rig, mud-drilled: pump required, air-drilled: compressor, time required, in 1 year a drilling rig in n...
  • Another case of well depth, expected yield, minimum final casing diameter, bore diameter, drilling rig, mud-drilled: pump required, air-drilled: compressor, time required, in 1 year a drilling rig ...
  • Third Scenario Idricom Capabilities
  • The organization of IDRICOM envisages that sites are manned by...
  • On the basis of the above description, the IDRICOM Consortium believes it is plausible to assume the use/deployment in any project abroad of about 1/5 of the plant held by member companies.
IDRICOM CONSORTIUM
Via Tirotti, 11 - 29122 PIACENZA - ITALY
email: idricom@idricom.com - website: www.idricom.com
powered by Infonet Srl Piacenza
Privacy Policy
Questo sito o gli strumenti terzi utilizzati si avvalgono di cookie necessari al funzionamento. Se vuoi saperne di più o negare il consenso a tutti o ad alcuni cookie, consulta la cookie policy.
Chiudendo questo banner, scorrendo questa pagina, cliccando su un link o proseguendo la navigazione, acconsenti all’uso dei cookie.
Maggiori informazioniOK